Home Library 2011 03 Alnajar GPIC Framing the best practices in Granulation Operation
Banner
2011 03 Alnajar GPIC Framing the best practices in Granulation Operation
Share/Save/Bookmark

Weathering the turbulence in the Granulation Section is very crucial to prevent loss of production in the Urea Granulation Plants. The short running cycle of the Granulation Process results in notable direct and indirect financial losses that include maintenance and operating costs.
The partial load during Granulator washing activity also often amounts to disturbances to the well aligned smooth performance of the Urea Synthesis Section.

This paper is removed from our E-Library.

Please login to read full article