• LESER, The Safety-Valve.com

    LESER, The Safety-Valve.com

  • FLUITEC Measure. Consult. Treat.

    FLUITEC Measure. Consult. Treat.

  • GRANDPERSPECTIVE: We make visible the invisible hazard

    GRANDPERSPECTIVE: We make visible the invisible hazard

  • SPRANA: The UAN Analyzer

    SPRANA: The UAN Analyzer

  • CRU’s Sustainable Fertilizer Production Technology Forum, 20-23 September 2021

    CRU’s Sustainable Fertilizer Production Technology Forum, 20-23 September 2021

My UreaKnowHow

Both username as well as password are capital sensitive.

Our Sister Websites

 

 

 

 

 

 

 

Statistics

Members:
UreaKnowHow.com: 7200+
UreaKnowHow.com & UreaNet.cn: 13200+
AmmoniaKnowHow.com: 1200+
 
Topics: 2000+
Posts: 9800+
Average posts per topic: 5+
Average posts per day: 2-3
 
Libraries:
Photos: 1200+
Videos: 340+
 
Revamp Guides: 
 
 

Safety Information

Total:
- Safety Risks in Urea Plants: 200+
- Safety Risks in Ammonia Plants: 1200+
 
Specific:
- Ammonia Feed Piping Risks: 10+
- Risks during Turnarounds: 10+
For our complete overview of Safety Risks, Incidents and Near Misses, check out FIORDA

Follow us

LinkedinYoutube

Urea Reactors form the centre of any urea plant. High pressures and temperatures, the corrosive circumstances and the health risks of ammonia in case of a leak put high demands to the integrity of such a vessel. The UreaKnowHow.com Incident Database introduced three years ago includes al-ready 21 serious incidents with Urea Reactors and other similar High Pressure Equipment items.

This paper includes the Risk Register of a Urea Reactor with a 316L Urea Grade liner. This design is typical for most urea reactors currently in operation. The Risk Register is a collection of possible hazards that can occur in such a urea reactor and includes the related mitigation measures: 37 safety hazards are identified and 37 recommendations / barriers are defined. These recommendations are categorized in this paper for each phase of the life of such a reactor, starting with the design and construction phase, commissioning and operational phase and maintenance phase. This list forms a perfect learning tool about why certain operating and maintenance procedures are done as they are done. One learns Why instead of only What.

 A fact that proves to be unexpectedly enlightening is that one can conclude from the Risk Register that 65% of the identified hazards can be mitigated by operating a proper leak detection system. This paper will also define the requirements of such a leak detection system, that follow again from the Risk Register.

 

Urea World News